Short Lead Time for Gray Water Tank Treatment - Integration CSTR – Boselan

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

During the past few years, our business absorbed and digested state-of-the-art technologies the two at home and abroad. Meanwhile, our firm staffs a group of experts devoted to your development of Water Storage Tanks Online , Sludge Holding Tank , Agriculture Water Storage Tank , Our company is dedicated to providing customers with high and stable quality products at competitive price, making every customer satisfied with our products and services.
Short Lead Time for Gray Water Tank Treatment - Integration CSTR – Boselan Detail:

 About It

Integration CSTR, is a common application of a kind of biogas tank, gas holder above, below is GFS tank. It has the advantages of saving occupied area and efficient use of space, which is the most popular application mode at present.

Most of them are used in small farms (about 10000-20000 livestock) and independently operated agricultural product and by product processing enterprises.  Our company can specify the diameter, height and color of the tank body according to the requirements of customers. Simple operation, convenient operation, no need for too much labor costs, the maintenance and operation are very simple. It is the first choice of most farmers and even enterprises. If you want to know the specific size selection and detailed information, please contact us.

 

photobank

Unique Porcelain Enamel Formula

Boselan developed its own enamel formula which make our porcelain more glazed, adhesive and smoothly. Avoided the pinhole and fishscales.

Edge Enameled Technology

Boselan tank’s edges coated with the same enameled material in order to avoid electrolysis of dissimilar metals, rust and weakening of the enameled bonding.

Edgecoat II

Standard Enamel Steel Plate Specification 

Volume ( m3 )

Diameter ( m )

Height ( m )

Floors ( layer )

Total Plate Number

511

6.11

18

15

116

670

6.88

18

15

135

881

7.64

19.2

16

160

993

14.51

6

5

95

1110

9.17

16.8

14

168

1425

13.75

9.6

8

144

1979

15.28

10.8

9

180

2424

16.04

12

10

210

2908

17.57

12

10

230

Installation Pictures



        Simple Biogas Process Chart        

8df610b1a43cfd9a00c85125d31b391b


Product detail pictures:

Short Lead Time for Gray Water Tank Treatment - Integration CSTR – Boselan detail pictures

Short Lead Time for Gray Water Tank Treatment - Integration CSTR – Boselan detail pictures

Short Lead Time for Gray Water Tank Treatment - Integration CSTR – Boselan detail pictures

Short Lead Time for Gray Water Tank Treatment - Integration CSTR – Boselan detail pictures


Related Product Guide:

We stick to the principle of "quality first, service first, continuous improvement and innovation to meet the customers" for the management and "zero defect, zero complaints" as the quality objective. To perfect our service, we provide the products with the good quality at the reasonable price for Short Lead Time for Gray Water Tank Treatment - Integration CSTR – Boselan, The product will supply to all over the world, such as: Bogota, Madrid, Burundi, Our company's main items are widely used all over the world; 80% of our products and solutions exported to the United States, Japan, Europe and other markets. All stuff sincerely welcome guests come to visit our factory.
  • We are really happy to find such a manufacturer that ensuring product quality at the same time the price is very cheap.
    5 Stars By Bernice from Austria - 2018.09.29 13:24
    We have been engaged in this industry for many years, we appreciate the work attitude and production capacity of the company, this is a reputable and professional manufacturer.
    5 Stars By Kay from Johor - 2018.12.11 14:13

    Related Products