Industry News

  • IC tower in Vietnam
    Post time: 07-27-2021

    For the wastewater treatment project of  paper mill in Vietnam, the IC tower of enamel assembled tank was completed.  Contact:Jane  email: jane@bsltank.com  whatsapp:008615373670441 Read more »

  • What design parameters are required for biogas projects?
    Post time: 07-23-2021

    When designing a biogas project, there are several parameters that must be accurate, which involvesthe project scale, treatment volume and product volume to be constructed in the future. 1. The amount of feces (amount of raw materials). If it is not the manure of the farm used, the quantity and ...Read more »

  • Upflow Anaerobic Sludge Bed Reactor (UASB)
    Post time: 07-23-2021

    upflow anaerobic sludge bed reactor (UASB) UASB is one of the fastest growing digesters, which is characterized by the bottom-up flow of sewage through the expanded granular sludge bed. The digester is divided into three zones, namely sludge bed, sludge layer and three-phase separator. The separa...Read more »

  • Why choose Glass-Fused-To-Steel-tank
    Post time: 06-19-2021

    The Glass-Fused-To-Steel-tank is assembled from special steel plates, special sealing materials, self-locking bolts and other materials. It can be used for the sealed storage of gases, liquids and solids in biogas engineering, sewage treatment, grain storage, petrochemical industries and other in...Read more »

  • Biomass energy is bound to do great things
    Post time: 06-18-2021

    Bio-mass energy in the development of our country more misunderstanding than understanding, more difficulties than support, but because of her natural beauty, and finally day by day to grow and grow. By the end of 2016, biomass generated 63.4 billion kilowatt-hours of electricity nationwide, whic...Read more »

  • Shanghai waste water treatment
    Post time: 06-18-2021

    4 Glass fused to steel bolted tanks has been built up in Shanghai, it will be used for waste water treatment. contact: Jane@bsltank.com mob:+8615373670441 Read more »

  • XuZhou waste water treatment
    Post time: 06-18-2021

    Glass fused to steel bolted tank 8.4m Dia. 21m H. UASB have been finished in Xuzhou City, China Contact:jane@bsltank.com mob:+8615373670441 Read more »