When designing a biogas project, there are several parameters that must be accurate, which involvesthe project scale, treatment volume and product volume to be constructed in the future.
1. The amount of feces (amount of raw materials). If it is not the manure of the farm used, the quantity and concentration of the raw materials used must be accurately grasped to facilitate process selection and equipment selection.
2. Biogas production. How much biogas can be produced in the end is a matter of great concern to the owner or investor, which is directly related to the economic benefits of the entire project.
Biogas engineering design parameters
3. The total amount of manure. Decide what size anaerobic reactor to use.
4. Water consumption for dilution. Calculate according to the amount of manure and feed concentration, and use clean water or biogas slurry to return.
5. The amount of biogas residue and biogas slurry. Because the surrounding environment of each project is different, the purpose of biogas residue and biogas slurry is also different. Knowing the output, you can prepare for disposal in advance.
Shijiazhuang City Zhaoyang Biogas Equipment Co., Ltd. was established in 2009, covering an area of more than 30 acres and employing more than 100 worker.
The company’s main products are enamel assembly tanks and double membrane gas storage tanks. The annual output of enamel steel plates reaches 60,000 sheets, and the total production capacity can reach more than 100,000 sheets. The annual output of double-membrane gas storage tanks reaches 200 sets. In recent years, the company has introduced advanced production equipment, continuously improved production technology, automated production workshops, and product quality reached the top level in the industry. Provide customers with high-quality complete sets of environmental protection equipment.
If you are Interested in what we can offer?Or interested in visiting one of our projects? Or do you need more information about our products?Or do you want to receive more information about our installations and technology?Or do you want to know what we can do for you?
Post time: Jul-23-2021